Titan 4D Plantaris (RT5653A)
🛡️ 5-Year Premium Warranty Included
The Titan 4D Plantaris (RT5653A) is a voice-controlled 4D chair built around dedicated calf and foot care, adding a rocking massage position most chairs in its class skip.
- 4D Massage Mechanism: Rollers vary speed, intensity and depth for a more three-dimensional massage than standard 3D tracks.
- Intelligent Voice Control: Start programs and adjust settings by voice command.
- Rocking Massage Position: A gentle rocking motion joins the roller massage for an added relaxation mode.
- Deep Calf Kneading & Calf Rollers: Dedicated calf rollers and bumpers knead the lower legs beyond typical airbag compression.
- Automatic Body Scan & 2-Stage Zero Gravity: Maps your frame at startup, then reclines through two zero-gravity positions.
- SL-Track, Space-Saving Frame: A continuous neck-to-hamstring track in a housing that needs minimal wall clearance.
- 24-Cell Air Compression & Lumbar Heating: Full-body airbag compression paired with heat therapy at the lower back.
- 22 Auto Programs & 6 Manual Modes: A large preset library plus manual settings, run from a touchscreen remote.
Warranty & Extended Coverage
Every Joy massage chair includes a 5-Year Premium Warranty at no extra cost, covering parts and labor.
Want extra peace of mind? Extend your coverage:
- +1 Year Extension — $250
- +2 Year Extension — $350
Contact us to add extended coverage to your order.
Shipping & Delivery
Free curbside shipping in the contiguous U.S.
White glove setup available

Titan 4D Plantaris (RT5653A)
The Titan 4D Plantaris (RT5653A) is a voice-controlled 4D chair built around dedicated calf and foot care, adding a rocking massage position most chairs in its class skip.
Highlights
Built around how you actually recover

4D Massage Mechanism
Rollers vary speed, intensity and depth for a more three-dimensional massage than standard 3D tracks.

Intelligent Voice Control
Start programs and adjust settings by voice command.

Rocking Massage Position
A gentle rocking motion joins the roller massage for an added relaxation mode.
More features
Everything else it does
Deep Calf Kneading & Calf Rollers
Dedicated calf rollers and bumpers knead the lower legs beyond typical airbag compression.
Automatic Body Scan & 2-Stage Zero Gravity
Maps your frame at startup, then reclines through two zero-gravity positions.
SL-Track, Space-Saving Frame
A continuous neck-to-hamstring track in a housing that needs minimal wall clearance.
24-Cell Air Compression & Lumbar Heating
Full-body airbag compression paired with heat therapy at the lower back.
22 Auto Programs & 6 Manual Modes
A large preset library plus manual settings, run from a touchscreen remote.
Specifications
At a glance
| Model | Titan 4D Plantaris (RT5653A) |
|---|---|
| Brand | Titan |
| Category | Massage Chairs |
| Massage mechanism | 4D |
| Warranty | 5-year premium warranty — parts, labor and structure. Terms vary by model. |
| Delivery | Free curbside delivery. White-glove setup available — ask us for a quote. |
| Availability | In stock — ready to order |
| Try before you buy | Sit in this model at our Bellevue, WA showroom |
Sit in it before you decide
Photos only go so far. Come try the Titan 4D Plantaris (RT5653A) at our Bellevue showroom, tell us where it hurts, and we will set the chair up for your body while you are here.
Visit the showroom
Visit our Bellevue showroom
Authorized Osaki & Titan dealer with a real showroom. This particular model isn’t on the floor, but you can sit in eleven others and we’ll walk you through how this one compares. See what’s on the floor.
- Address
- 15600 NE 8th St Ste K-12, Bellevue, WA 98008
- Hours
- Mon–Sat 12:00–7:00 PM · Sun 12:00–5:30 PM